Availability: | |
---|---|
Quantity: | |
Gathering Fire Monitor Towers Supply
The structure of Monitor tower is strictly in accordance with the relevant national standards and designs.
It is secure and stable.
It is in security and stability.
The fire tower has a certain safety protection measures and spray cooling measures.
There are ladder & protection cage and lighting protection.
Type: The monitor tower has Double layer and single layer available.
Specification of Monitor Tower
Parameters | Model | ||||||||
PT6 | PT8 | PT10 | PT12 | PT16 | PT18 | PT20 | PT30 | ||
Up-Platform(m) | 6 | 8 | 10 | 12 | 16 | 18 | 20 | 30 | |
Down-Platform(m) | 3.5 | 5.5 | 7.5 | 9.5 | 13.5 | 15.5 | 17.5 | 27.5 | |
Main Pipe Dia.(mm) | 529 | 529 | 720 | 720 | 820 | 820 | 920 | 1020 | |
Foam Pipe Dia.(mm) | 100/125/150/175/200/250/300 | ||||||||
Water Pipe Dia.(mm) | 100/125/150/175/200/250/300 | ||||||||
Spray Cooling Pipe Dia. (mm) | 150 | ||||||||
Positioning Template(m) | 1.1*1.1 | 1.4*1.4 |
External FIFI System
Gathering Fire Monitor Towers Supply
The structure of Monitor tower is strictly in accordance with the relevant national standards and designs.
It is secure and stable.
It is in security and stability.
The fire tower has a certain safety protection measures and spray cooling measures.
There are ladder & protection cage and lighting protection.
Type: The monitor tower has Double layer and single layer available.
Specification of Monitor Tower
Parameters | Model | ||||||||
PT6 | PT8 | PT10 | PT12 | PT16 | PT18 | PT20 | PT30 | ||
Up-Platform(m) | 6 | 8 | 10 | 12 | 16 | 18 | 20 | 30 | |
Down-Platform(m) | 3.5 | 5.5 | 7.5 | 9.5 | 13.5 | 15.5 | 17.5 | 27.5 | |
Main Pipe Dia.(mm) | 529 | 529 | 720 | 720 | 820 | 820 | 920 | 1020 | |
Foam Pipe Dia.(mm) | 100/125/150/175/200/250/300 | ||||||||
Water Pipe Dia.(mm) | 100/125/150/175/200/250/300 | ||||||||
Spray Cooling Pipe Dia. (mm) | 150 | ||||||||
Positioning Template(m) | 1.1*1.1 | 1.4*1.4 |
External FIFI System